Recreation and Park Commission of East Baton Rouge ParishVisit BREC.org
BRECFiscalTransparency Portal

Making EBR better.

Digital checkbook

One row per payment instrument issued by the Commission. Void instruments are listed and labelled, so the list can be reconciled with the bank without hiding documents that were cancelled.

Filter these figures

What is not in these figures

  • Payments to withheld payee categories: 0 payments totalling $0.00. Withheld under the publication policy. They are excluded from every count, chart and download on this page — they are not shown as blank rows.
  • Records not marked for publication: 0 payments. Outside the approved public scope for this release.

Payment patterns

These charts count cash payments by payment date — the day money left the Commission — and never mix into budget or ledger figures. 2 void instrumentss are excluded from every bar at a total of -$274,162.63 and counted here rather than hidden.

Cash payments by payment date

When was the money paid out?

See every figure in “Cash payments by payment date” as a table
Cash payments by payment date: 12 categories, 2 measures. Source: Publication #2622 · data as of Nov 17, 2026.
Payment monthPaid on valid instrumentsInstrumentsOpen
Jan 2025No payments published in this month0Open
Feb 2025$62,096.981Open
Mar 2025No payments published in this month0Open
Apr 2025No payments published in this month0Open
May 2025No payments published in this month0Open
Jun 2025No payments published in this month0Open
Jul 2025$44,245.541Open
Aug 2025$151,640.802Open
Sep 2025$324,098.881Open
Oct 2025$268,457.512Open
Nov 2025No payments published in this month0Open
Dec 2025No payments published in this month0Open

Net: 850,539.71 · Void Amount: -274,162.63 · Void Count: 2 · Instrument Count: 7

Publication #2622 · data as of Nov 17, 2026How this figure is computed

Who was paid the most

Which payees received the largest share of these payments?

See every figure in “Who was paid the most” as a table
Who was paid the most. 1 of 1 categories have data. Total paid on valid instruments: $850,540. Largest: Design Engineering, Inc. at $850,540 (100% of the total). Source: Publication #2622 · data as of Nov 17, 2026.
PayeePaid on valid instrumentsOpen
Design Engineering, Inc.$850,539.71Open

Net: 850,539.71 · Void Amount: -274,162.63 · Void Count: 2

Publication #2622 · data as of Nov 17, 2026How this figure is computed

How the payments were made

How is the money actually transferred?

See every figure in “How the payments were made” as a table
How the payments were made. 1 of 2 categories have data. Total paid on valid instruments: $850,540. Largest: T at $850,540 (100% of the total). Source: Publication #2622 · data as of Nov 17, 2026.
MethodPaid on valid instrumentsOpen
T$850,539.71Open
VOnly void instruments published with this methodOpen

Net: 850,539.71 · Void Amount: -274,162.63 · Void Count: 2

Publication #2622 · data as of Nov 17, 2026How this figure is computed

A fund and department breakdown of these payments appears here whenever the selection is scoped to a fund or department, or via breakdown in the address.

Payment instruments — 9 instruments match the filters
DocumentDatePayeeAmount, not sortedCharged to selectionFund / departmentMethodStatus
25585Oct 24, 2025Design Engineering, Inc.-$179,181.19$0.00—VVoid
25655Oct 24, 2025Design Engineering, Inc.$179,181.19$179,181.19Capital Improvements Fund / Planning and EngineeringTValid
25003Oct 3, 2025Design Engineering, Inc.$89,276.32$89,276.32Capital Improvements Fund / Planning and EngineeringTValid
24856Sep 26, 2025Design Engineering, Inc.$324,098.88$324,098.88Capital Improvements Fund / Planning and EngineeringTValid
24221Aug 22, 2025Design Engineering, Inc.$56,659.36$56,659.36Capital Improvements Fund / Planning and EngineeringTValid
23961Aug 15, 2025Design Engineering, Inc.-$94,981.44$0.00—VVoid
24085Aug 15, 2025Design Engineering, Inc.$94,981.44$94,981.44Capital Improvements Fund / Planning and EngineeringTValid
23558Jul 25, 2025Design Engineering, Inc.$44,245.54$44,245.54Capital Improvements Fund / Planning and EngineeringTValid
20489Feb 14, 2025Design Engineering, Inc.$62,096.98$62,096.98Capital Improvements Fund / Planning and EngineeringTValid
Total over all matching instruments$850,539.71

How to read these figures

  • "Charged to selection" is the portion of each payment coded to the filtered department or category. Where no allocation detail is published for an instrument, that column is blank rather than assuming the whole payment belongs there (2 instruments in this selection).
  • Bank clearance status is not sourced, so no payment is described as cleared.
  • Payment totals reconcile to the payment register, not to ledger expenditure: some expenditure is settled without an instrument, and some instruments settle prior-year obligations.