Recreation and Park Commission of East Baton Rouge ParishVisit BREC.org
BRECFiscalTransparency Portal

Making EBR better.

Budget and actuals

Start at the fiscal year and drill down to a single general-ledger account and its posted entries. Figures at each level are SQL totals over every account beneath it, so a parent row always equals the sum of its children rather than only the rows shown. This browser covers expenditure accounts; revenue, asset and liability accounts are not summed into these budget and actual figures, and revenue appears on the home revenue figures instead.

Filter these figures

The filters above are for the flat account list. The drilldown table on this page narrows by clicking a row, and the URL always shows exactly where you are.

GL accounts within Special Service Crew

GL accounts within Special Service Crew: revised budget and expenditure

Which gl accounts hold the budget, and how much of it has been spent?

See every figure in “GL accounts within Special Service Crew: revised budget and expenditure” as a table
GL accounts within Special Service Crew: revised budget and expenditure: 13 categories, 2 measures. Source: Publication #2616, data through 2026-11-17. Revised budget is the sum of this group's account-level revised budgets..
GL accountRevised budgetExpenditureOpen
517220 — 517220$335,694.68$525,038.29Open
188300 — 188300$0.00-$405,703.60Open
476801 — 476801$305,979.28$283,711.25Open
416201 — 416201$275,000.00$262,052.50Open
426301 — 426301$100,000.00$100,158.15Open
426302 — 426302$60,000.00$54,399.37Open
466704 — 466704$25,000.00$10,914.67Open
486904 — 486904$25,000.00$0.00Open
426308 — 426308$3,750.00$3,555.10Open
426303 — 426303$3,000.00$774.60Open
476808 — 476808$2,000.00$0.00Open
507109 — 507109$500.00$590.57Open
All other gl accounts at this level$500.00$683.61Open

Nodes: 17 · Accounts: 16 · Entry Count: 714

Publication #2616, data through 2026-11-17. Revised budget is the sum of this group's account-level revised budgets.How this figure is computed

GL accounts in fiscal year 2026, ranked by budget size. Totals below are over all 17 items at this level.
GL accountOriginal budgetRevised budgetExpenditureUtilisationAvailableAccountsEntriesNext level
517220 — 517220$250,000.00$335,694.68$525,038.29156.4%-$239,705.842 accounts163 entrysDrill down
188300 — 188300$0.00$0.00-$405,703.60Not applicableNot applicable1 account10 entrysDrill down
476801 — 476801$175,000.00$305,979.28$283,711.2592.7%-$212,766.082 accounts392 entrysDrill down
416201 — 416201$275,000.00$275,000.00$262,052.5095.3%$12,947.501 account24 entrysDrill down
426301 — 426301$100,000.00$100,000.00$100,158.15100.2%-$158.151 account24 entrysDrill down
426302 — 426302$60,000.00$60,000.00$54,399.3790.7%$5,600.631 account23 entrysDrill down
466704 — 466704$25,000.00$25,000.00$10,914.6743.7%$14,085.331 account9 entrysDrill down
486904 — 486904$25,000.00$25,000.00$0.000.0%$25,000.000 accounts0 entrysDrill down
426308 — 426308$3,750.00$3,750.00$3,555.1094.8%$194.901 account24 entrysDrill down
426303 — 426303$3,000.00$3,000.00$774.6025.8%$2,225.401 account25 entrysDrill down
476808 — 476808$2,000.00$2,000.00$0.000.0%$2,000.000 accounts0 entrysDrill down
507109 — 507109$500.00$500.00$590.57118.1%-$90.571 account10 entrysDrill down
466702 — 466702$250.00$250.00$293.32117.3%-$43.321 account3 entrysDrill down
466703 — 466703$250.00$250.00$142.0256.8%$107.981 account2 entrysDrill down
466706 — 466706$0.00$0.00$248.27Not applicableNot applicable1 account3 entrysDrill down
466716 — 466716$0.00$0.00$0.00Not applicableNot applicable1 account2 entrysDrill down
517204 — 517204$0.00$0.00$0.00Not applicableNot applicable0 accounts0 entrysDrill down
Total at this level$919,750.00$1,136,423.96$836,174.5173.6%$11,853.1116 accounts714 entrys

How to read these figures

  • Utilisation is expenditure ÷ revised budget, shown only when the revised budget is greater than zero. A zero or negative budget is labelled, never shown as a percentage.
  • Available = revised − expenditure − encumbrance − requisition reservations.
  • A parent figure covers every account beneath it, including ones not shown because the list is capped; the row counts state the population. Revised budget at every level is the sum of the revised budgets of the accounts inside it (per-account sum).
  • Unassigned means the ledger code is blank in that segment for the accounts concerned — it is a real grouping, not an error to be summed away.